|
![]() |
||||||||||||||||||||||||||||||||
![]() |
|
||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
In 2007 NORD were appointed to work with the Olympic Delivery Authority
to develop a strong contextual approach to a key utility building within
the Olympic Park.
The building is not designed as an event in its own right but as part of
a number of buildings that form the fabric of the Olympic site itself; having
permanency, weight and dignity. The utility structures are being developed
to consider a common palette of reference materials where these relate to
their use and location.






lighthouse
foyer | scottish
film studio | destiny
church | flat
project
govanhill pool | timespan
heritage